068 | 2020 | Saint-André-de-Cubzac, France | 1500m²
Construction of an Industrial Building
A light-filled building houses a laundry in an industrial zone under construction. The project contains offices, a vacant room available for rent, and a room that houses machines for the entire washing, stain removal, drying, and ironing process.<br />
<br />
The space layout is designed to ensure responsible energy consumption, made possible by a water management system, ample natural lighting, and solar panels.<br />
<br />
The offices on the first floor are accessible via an external staircase. They are flanked by a passageway that provides direct, elevated visual access to the workshops. The vast and brightly lit space is designed to ensure employee comfort while working.<br />
<br />